2

an issue on using the Openstudio "Add Interval Schedule From File" measure

Hello my friends: I have a issue on using the Openstudio "Add Interval Schedule From File", and please let me explain my question. I am trying to create a plant load schedule with 8760 hour values to be referenced by my chiller system. I am am using the Openstudio "Add Interval Schedule From File" measue for this purpose, with a CSV file referenced by the this measure. But after i made the setting of this measure, i cannot find the imported schedule anywhere in my openstudio model. I checked the Schedule Set and Schedule Tabs, but i did not see the schedule i am importing. After i run my openstudio model, i checked the eplusout.err file and found a warning sentence that related to the schedule i am importing. I just put some screenshot of my openstudio model so that you can have a clear understanding of my question. Hopefully someone can help me with it and thank you in advance. image description image description image description

Dr. Fan's avatar
430
Dr. Fan
asked 2020-07-30 02:53:04 -0500
__AmirRoth__'s avatar
4.4k
__AmirRoth__
updated 2020-07-30 07:24:02 -0500
edit flag offensive 0 remove flag close merge delete

Comments

add a comment see more comments

1 Answer

3

The problem was solved. In the first time, i run the simulation after i made the setting of the measure without clicking the "Apply Measure Now" button in the Component&Measure menu. After i clicked the Apply Measure Now button, it worked well. Thank you

Dr. Fan's avatar
430
Dr. Fan
answered 2020-07-30 06:43:54 -0500
edit flag offensive 0 remove flag delete link

Comments

add a comment see more comments