Availability Schedule Measure
I have project with 153 zones. In most zones I am using a Water to Air Heatpump. I need to change the availability schedule of each heat pump. I am fairly redundant task tolerant but in OS this gets a little long for even me. I am not a coder but I cannot dissect and modify code where necessary. Anyone know of an existing measure I could modify for this purpose?
Comments
@jmoody is it the same schedule for all zones?
The vast majority are the same zone with probably 30 exceptions.