If the proposed building has a snow melt system, does the baseline need to have a snow melt system too? I'm having trouble understanding the language in Appendix G about end uses.
If the proposed building has a snow melt system, does the baseline need to have a snow melt system too? I'm having trouble understanding the language in Appendix G about end uses.
I found an answer here: https://leeduser.buildinggreen.com/fo...
Basically snow melt is considered a process load and thus must be included in the baseline.