Revision history  [back]

Is there a reason why I have unmet hours when I have ideal air loads and mostly everything is autosized?

I am gradually adding HVACs to a building. But, I noticed when I started out and ran the first simulation I was getting unmet hours. Everything in my model is autosized and ideal so I find it strange that the thermal zones would have a large number of unmet hours.

unmet hours in the openstudio report below: image description