solar distribution prob
Does anyone have suggestions to remove the following errors?
** Severe ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
** ~~~ ** but Zone ="THERMAL ZONE: BEDROOM 2" does not appear to have any floor surfaces.
** ~~~ ** Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues...
** Severe ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
** ~~~ ** but Zone ="THERMAL ZONE: PLAY" does not appear to have any floor surfaces.
** ~~~ ** Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues...
************* Testing Individual Branch Integrity
************* All Branches passed integrity testing
************* Testing Individual Supply Air Path Integrity
************* All Supply Air Paths passed integrity testing
************* Testing Individual Return Air Path Integrity
************* All Return Air Paths passed integrity testing
************* No node connection errors were found.
************* Beginning Simulation
************* Simulation Error Summary *************
************* There are 23 unused schedules in input.
************* There are 40 unused week schedules in input.
************* There are 97 unused day schedules in input.
************* Use Output:Diagnostics,DisplayUnusedSchedules; to see them.
*************
************* ===== Final Error Summary =====
************* The following error categories occurred. Consider correcting or noting.
************* Nominally Unused Constructions
************* ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause
************* ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm
************* ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option).
*************
************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
************* EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors.
************* EnergyPlus Completed Successfully-- 17 Warning; 2 Severe Errors; Elapsed Time=00hr 00min 6.41sec
Thanks
solar distribution prob
Does anyone have suggestions to remove the following errors?
** Severe ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
**
* ~~~ ** * but Zone ="THERMAL ZONE: BEDROOM 2" does not appear to have any floor surfaces.
** * ~~~ ** * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues...
** * Severe ** * ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
** * ~~~ ** * but Zone ="THERMAL ZONE: PLAY" does not appear to have any floor surfaces.
** * ~~~ ** * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues...
************* *** Testing Individual Branch Integrity
************* *** All Branches passed integrity testing
************* *** Testing Individual Supply Air Path Integrity
************* *** All Supply Air Paths passed integrity testing
************* *** Testing Individual Return Air Path Integrity
************* *** All Return Air Paths passed integrity testing
************* *** No node connection errors were found.
************* *** Beginning Simulation
************* *** Simulation Error Summary *************
************* *** *** There are 23 unused schedules in input.
************* *** There are 40 unused week schedules in input.
************* *** There are 97 unused day schedules in input.
************* *** Use Output:Diagnostics,DisplayUnusedSchedules; to see them.
*************
************* them.
*** ===== Final Error Summary =====
************* *** The following error categories occurred. Consider correcting or noting.
************* *** Nominally Unused Constructions
************* *** ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause
************* *** ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm
************* *** ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option).
*************
************* option).
*** EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
Thanks************* *** EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors.
************* *** EnergyPlus Completed Successfully-- 17 Warning; 2 Severe Errors; Elapsed Time=00hr 00min 6.41sec
6.41sec
solar distribution prob
** Severe ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
* ~~~ * but Zone ="THERMAL ZONE: BEDROOM 2" does not appear to have any floor surfaces. * ~~~ * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues... * Severe * ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor, * ~~~ * but Zone ="THERMAL ZONE: PLAY" does not appear to have any floor surfaces. * ~~~ * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues... *** Testing Individual Branch Integrity *** All Branches passed integrity testing *** Testing Individual Supply Air Path Integrity *** All Supply Air Paths passed integrity testing *** Testing Individual Return Air Path Integrity *** All Return Air Paths passed integrity testing *** No node connection errors were found. *** Beginning Simulation *** Simulation Error Summary *** *** There are 23 unused schedules in input. *** There are 40 unused week schedules in input. *** There are 97 unused day schedules in input. *** Use Output:Diagnostics,DisplayUnusedSchedules; to see them.
*** ===== Final Error Summary ===== *** The following error categories occurred. Consider correcting or noting. *** Nominally Unused Constructions *** ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause *** ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm *** ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option).
*** EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors. *** EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors. *** EnergyPlus Completed Successfully-- 17 Warning; 2 Severe Errors; Elapsed Time=00hr 00min 6.41sec