solar distribution prob

Does anyone have suggestions to remove the following errors?

** Severe  ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
**   ~~~   ** but Zone ="THERMAL ZONE: BEDROOM 2" does not appear to have any floor surfaces.
**   ~~~   ** Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues...
** Severe  ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
**   ~~~   ** but Zone ="THERMAL ZONE: PLAY" does not appear to have any floor surfaces.
**   ~~~   ** Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues...
************* Testing Individual Branch Integrity
************* All Branches passed integrity testing
************* Testing Individual Supply Air Path Integrity
************* All Supply Air Paths passed integrity testing
************* Testing Individual Return Air Path Integrity
************* All Return Air Paths passed integrity testing
************* No node connection errors were found.
************* Beginning Simulation
************* Simulation Error Summary *************
************* There are 23 unused schedules in input.
************* There are 40 unused week schedules in input.
************* There are 97 unused day schedules in input.
************* Use Output:Diagnostics,DisplayUnusedSchedules; to see them.
*************
************* ===== Final Error Summary =====
************* The following error categories occurred.  Consider correcting or noting.
************* Nominally Unused Constructions
************* ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause
************* ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm
************* ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option).
*************
************* EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors.
************* EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors.
************* EnergyPlus Completed Successfully-- 17 Warning; 2 Severe Errors; Elapsed Time=00hr 00min  6.41sec

Thanks

solar distribution prob

Does anyone have suggestions to remove the following errors?

** Severe  ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,
** 

* ~~~ ** * but Zone ="THERMAL ZONE: BEDROOM 2" does not appear to have any floor surfaces. ** * ~~~ ** * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues... ** * Severe ** * ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor, ** * ~~~ ** * but Zone ="THERMAL ZONE: PLAY" does not appear to have any floor surfaces. ** * ~~~ ** * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues... ************* *** Testing Individual Branch Integrity ************* *** All Branches passed integrity testing ************* *** Testing Individual Supply Air Path Integrity ************* *** All Supply Air Paths passed integrity testing ************* *** Testing Individual Return Air Path Integrity ************* *** All Return Air Paths passed integrity testing ************* *** No node connection errors were found. ************* *** Beginning Simulation ************* *** Simulation Error Summary ************* ************* *** *** There are 23 unused schedules in input. ************* *** There are 40 unused week schedules in input. ************* *** There are 97 unused day schedules in input. ************* *** Use Output:Diagnostics,DisplayUnusedSchedules; to see them. ************* ************* them.


*** ===== Final Error Summary ===== ************* *** The following error categories occurred. Consider correcting or noting. ************* *** Nominally Unused Constructions ************* *** ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause ************* *** ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm ************* *** ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option). ************* ************* option).


*** EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors. ************* *** EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors. ************* *** EnergyPlus Completed Successfully-- 17 Warning; 2 Severe Errors; Elapsed Time=00hr 00min 6.41sec

Thanks6.41sec

solar distribution prob

** Severe  ** ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor,

* ~~~ * but Zone ="THERMAL ZONE: BEDROOM 2" does not appear to have any floor surfaces. * ~~~ * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues... * Severe * ComputeIntSolarAbsorpFactors: Solar distribution model is set to place solar gains on the zone floor, * ~~~ * but Zone ="THERMAL ZONE: PLAY" does not appear to have any floor surfaces. * ~~~ * Solar gains will be spread evenly on all surfaces in the zone, and the simulation continues... *** Testing Individual Branch Integrity *** All Branches passed integrity testing *** Testing Individual Supply Air Path Integrity *** All Supply Air Paths passed integrity testing *** Testing Individual Return Air Path Integrity *** All Return Air Paths passed integrity testing *** No node connection errors were found. *** Beginning Simulation *** Simulation Error Summary *** *** There are 23 unused schedules in input. *** There are 40 unused week schedules in input. *** There are 97 unused day schedules in input. *** Use Output:Diagnostics,DisplayUnusedSchedules; to see them.


*** ===== Final Error Summary ===== *** The following error categories occurred. Consider correcting or noting. *** Nominally Unused Constructions *** ..The nominally unused constructions warning is provided to alert you to potential conditions that can cause *** ..extra time during simulation. Each construction is calculated by the algorithm indicated in the HeatBalanceAlgorithm *** ..object. You may remove the constructions indicated (when you use the DisplayExtraWarnings option).


*** EnergyPlus Warmup Error Summary. During Warmup: 0 Warning; 0 Severe Errors. *** EnergyPlus Sizing Error Summary. During Sizing: 0 Warning; 0 Severe Errors. *** EnergyPlus Completed Successfully-- 17 Warning; 2 Severe Errors; Elapsed Time=00hr 00min 6.41sec