Run period profiles
Hi, I 'm using openstudio 1.8
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)
Edited---------------------
The Facility Tab, sorting by space type and Thermal zone
Edit ---------------------------------------------------------------
The Default profile works fine! The question is why overrides priority profiles
Results
EDIT--------------------------------------------------------------
Run period profiles
Hi, I 'm using openstudio 1.8
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)
Edited---------------------
The Facility Tab, sorting by space type and Thermal zone
Edit ---------------------------------------------------------------
The Default profile works fine! The question is why overrides priority profiles
Results
EDIT--------------------------------------------------------------
Run period profiles
Hi, I 'm using openstudio 1.8
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)
Edited---------------------
The Facility Tab, sorting by space type and Thermal zone
Edit ---------------------------------------------------------------
The Default profile works fine! The question is why overrides priority profiles
Results
Run period profiles
Hi, I 'm using openstudio 1.8
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
It seems like the default run period overrides all others. Why is this happening? (why not taking account the power variations of electric equipment)
Edited---------------------
The Facility Tab, sorting by space type and Thermal zone
Edit ---------------------------------------------------------------
The Default profile works fine! The question is why overrides priority profiles
Results
Run period profiles
Hi, I 'm using openstudio 1.8
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
It seems like the default run period overrides all others.
Why is this happening? (why not taking account the power variations of electric equipment)
Edited---------------------
The Facility Tab, sorting by space type and Thermal zone
Run period profiles
Hi, I 'm using openstudio 1.8
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
Why is this happening? (why not taking account the power variations of electric equipment)
Edited---------------------
The Facility Tab, sorting by space type and Thermal zone
Run period profiles
Hi, I 'm using openstudio 1.8Hi,
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
Why is this happening? (why not taking account the power variations of electric equipment)
Run period profiles
Hi,
In the loads tab I set the maximum design level for the electric equipment load:
In space tab/loads I set the schedule for the electric equipment load as "IT Room Equip"
In schedules tab/schedules I set hourly fractional run period profiles according to the variations of electric equipment load for specific days of the year
In schedules tab/schedules sets I set Electric Equipment as "IT Room Equip"
In ResultsViewer I see no variation of Zone Electric Equipment Electric Power.
Why is this happening? (why not taking account the power variations of electric equipment)