EMS Scheduling problem

Hello, we are calculating the transpiration load of plants using Energy Plus EMS.

However, we confirmed that the schedule according to the time zone was not applied even if the schedule was entered into EMS:program.
I set the Actuated Component type to Schedule:compact in the EMS actuator, and I think this error may be related to this. If settings are needed in Schedule:compact, please advise on how to set them up.

And in order to include the transpiration Load as a cooling load, I tried adding a (-) sign to Actuator Qtrans when writing code in EMS: Program (but not in the attached file), but it is calculated as a heating load. What should I do to set it as a cooling load?

Please help me solve these two problems.

The idf file is attached to the link below. Thank you. https://drive.google.com/file/d/1ozmp...

chloe's avatar
21
chloe
asked 2024-08-06 01:51:26 -0500
Aaron Boranian's avatar
14.1k
Aaron Boranian
updated 2024-08-09 16:09:20 -0500
edit flag offensive 0 remove flag close merge delete

Comments

add a comment see more comments