I am using OpenStudio Application v1.0 with OpenStudio (Core) v3.0. I have tried to use the Predicted Mean Vote measure with all required inputs (i.e., MRT calculation type, work efficiency schedule, clothing insulation schedule, air velocity schedule, and reporting frequency). The in.idf also shows the inputs as provided below. Still, there is no effect on the "Time Not Comfortable Based on Simple ASHRAE 55-2004" table results. Are there any inputs/settings I may miss in the process?

Thank you very much.