Simulation failed with modified HVAC schedules

Before my modification, everything is normal, the simulation is smooth and the OpenStudio Results can be generated. However, then I modified the setpoint schedules (cooling, heating, humidifying & dehumidifying). There were no complicate change, I just shortened the operation periods for the four schedules. Then I ran the simulation and obtained the following figure. image description Now even I change back the setpoint schedules, the simulation cannot go on. Have anyone met this situation?

In addition, deleting the schedule and reinserting the schedules did not work.

shmily_world's avatar
133
shmily_world
asked 2021-07-30 21:55:10 -0500
Aaron Boranian's avatar
14.1k
Aaron Boranian
updated 2021-07-31 10:14:03 -0500
edit flag offensive 0 remove flag close merge delete

Comments

@shmily_world it looks like it is failing when trying to process EnergyPlus measures. Do you have any EnergyPlus measures assigned to the OpenStudio model in the Measures tab (piece of paper icon on the left edge)?

Aaron Boranian's avatar Aaron Boranian (2021-07-31 10:14:50 -0500) edit