How to model timer control for DHW in Energyplus(EP-Launch).

I would like to model a DWH with timer control(2 types). 1.In the peak load time it should not work 2.Then from 1 am to 5 am it should not work. How to model both these condition as 2 separate case to understand gas usage ?

Adharsh's avatar
61
Adharsh
asked 2021-07-15 07:44:19 -0500
__AmirRoth__'s avatar
4.4k
__AmirRoth__
updated 2021-07-31 12:58:34 -0500
edit flag offensive 0 remove flag close merge delete

Comments

@Adharsh what simulation tool are you using? Please mention the tool in your title or question body, as well as the tag for it. This will help others provide better answers.

Aaron Boranian's avatar Aaron Boranian (2021-07-15 08:23:18 -0500) edit

Its in Energy Plus. Added that now. Thanks.

Adharsh's avatar Adharsh (2021-07-16 06:34:28 -0500) edit
add a comment see more comments

1 Answer

1

There are several ways to adjust DHW operation, but the simplest would be either to assign an AvailabilityManager:Schedule with a schedule that specifies the water heater operation period, or adjust the Flow Rate Fraction Schedules specified in the WaterUse:Equipment objects (if that's how you're specifying DHW usage).

ericmartinpe's avatar
2.1k
ericmartinpe
answered 2021-07-21 14:25:50 -0500
edit flag offensive 0 remove flag delete link

Comments

Thanks!! Eric Martin

Adharsh's avatar Adharsh (2021-08-09 03:13:16 -0500) edit