Demand control ventilation: LEED

Hi, I'm modelling a DCV for leed credits (90.1 2007).

The design has insufficient outdoor air to mantain the CO2 setpoint levels. Can I model it without worrying about it?

Should I just model the same outdoor air for both models (the baseline zone requires DCV according to 6.4.3.9)?

Gio's avatar
1.1k
Gio
asked 2018-04-04 09:06:18 -0500
edit flag offensive 0 remove flag close merge delete

Comments

add a comment see more comments