Revision history  [back]

1) 3,000 cfm is the OA threshold at the system level 2) System mapping should not change based on DCV requirements. Also, it's unlikely you'll only have one zone of a multi-zone system requiring DCV as (90.1-2016) G3.1.1-C probably requires a dedicated system. 3) Doesn't matter. The zone total OA just has to match the total cfm specified in the design (or as allowed by 62.1)

1) 3,000 cfm is the OA threshold at the system level 2) System mapping should not change based on DCV requirements. Also, it's unlikely you'll only have one zone of a multi-zone system requiring DCV as (90.1-2016) G3.1.1-C probably requires a dedicated system. 3) Doesn't matter. The zone total OA just has to match the total cfm specified in the design (or as allowed by 62.1)