Revision history  [back]

  • Typically, the setpoint managers belong on the supply side outlet node.
  • The bypass branches should be in parallel with your supply side equipment, and your demand side equipment.
  • Your boilers should either be on the same branch as your water heater in series, or on parallel branches to your water heater (and your bypass branch).

In parallel:

image description

In series:

image description

  • Typically, the setpoint managers belong on the supply side outlet node.
  • The bypass branches should be in parallel with your supply side equipment, and your demand side equipment.
  • Your boilers should either be on the same branch as your water heater in series, or on parallel branches to your water heater (and your bypass branch).

In parallel:

image description

In series:

image description